The paperExchangeCrypto WikiWikiAcademynotitiaplatform.com
Sign in
● LIVE
CAC 408 033,3▼ 0.14%S&P 5007 160,6▼ 1.06%EURO STOXX5 994,1▼ 1.32%BTC/USD59 600▼ 4.91%ETH/USD1 673,5▼ 5.65%EUR/USD1.10▲ 0.61%BRENT87.06▲ 0.44%GOLD3 562,1▼ 2.45%OAT 10Y4.88%▼ 0.69%VIX29.04▲ 9.09%CAC 408 033,3▼ 0.14%S&P 5007 160,6▼ 1.06%EURO STOXX5 994,1▼ 1.32%BTC/USD59 600▼ 4.91%ETH/USD1 673,5▼ 5.65%EUR/USD1.10▲ 0.61%BRENT87.06▲ 0.44%GOLD3 562,1▼ 2.45%OAT 10Y4.88%▼ 0.69%VIX29.04▲ 9.09%
 
Europe edition
Notitia
← Back
CompaniesBFM Business

This is the project of the century for Vietnam: French company Systra wins a $400 million contract to prepare for the arrival of high-speed trains in the Asian country

The country wants to build 1,541 kilometers of high-speed line between the capital Hanoi, in the north, and Ho Chi Minh City in the south through 23 stops. Travel time between the two cities will be reduced from 30…

BB
BFM Business
Newswire · 2 h ago
◌ Single source2 min read
✦ Explain it to me
This is the project of the century for Vietnam: French company Systra wins a $400 million contract to prepare for the arrival of high-speed trains in the Asian country

Vietnam is methodically continuing preparations for its project of the century: the construction of a high-speed train line linking the capital Hanoi to Ho Chi Minh City. The contract is colossal: at least $67 billion for more than 1,541 kilometers between the capital, in the North, and the economic heart of the country, in the South through 23 stops.

Travel time between the two cities will be reduced from 30 hours to around five. The government has just awarded a consulting contract worth $397 million to a consortium of eight companies. This is the largest contract awarded to date for this project.

Good news, it is the consortium led by the French engineering and consulting company specializing in public transport Systra which has won this contract. The consortium is also made up of South Korean (notably the national railway operator Korea National Railway) and Vietnamese companies. It was nevertheless the only consortium to have submitted an offer before the deadline of November 9.

Key stage This lot constitutes a key stage in the preparation of the project. The consortium will carry out technical studies and a feasibility study, evaluating options relating to technology, investment structure, financing and economic viability, all within 30 months. He will also be responsible for developing the overall technical design and preparing the tender documents for the construction and equipment installation packages.

Construction of the line is expected to take just eight years, with delivery in 2035. With this line, Vietnam will join the 23 countries on the planet operating high-speed trains. 20 of them have networks greater than 100 kilometers and seven have networks greater than 1.

000 kilometers. China has the most extensive network (by far) with more than 40,000 kilometers of high-speed lines ahead of Spain, Japan and France.

Source · BFM Business ↗

Machine-translated from French

Not cross-checked yet

Only BFM Business reports this story so far. We show it as a single source until another newsroom confirms it.

The reports
  1. BFM Business
    24 Nov, 15:45
Trust score: 78/100
Publisher BFM Business (established tier)+76
Detailed summary+2
Total78

Method: reports are grouped by the words of their headline and summary; each newsroom counts once; figures are read from the reports as published. Nothing here is written by an AI.