The paperExchangeCrypto WikiWikiAcademynotitiaplatform.com
Sign in
● LIVE
CAC 408 080,7▼ 0.81%S&P 5007 207,2▼ 1.59%EURO STOXX6 113,9▼ 0.66%BTC/USD62 630▼ 0.27%ETH/USD1 774,3▲ 0.77%EUR/USD1.10▲ 0.00%BRENT89.97▲ 0.90%GOLD3 675,8▼ 1.77%OAT 10Y5.06%▼ 0.20%VIX27.56▲ 12.21%CAC 408 080,7▼ 0.81%S&P 5007 207,2▼ 1.59%EURO STOXX6 113,9▼ 0.66%BTC/USD62 630▼ 0.27%ETH/USD1 774,3▲ 0.77%EUR/USD1.10▲ 0.00%BRENT89.97▲ 0.90%GOLD3 675,8▼ 1.77%OAT 10Y5.06%▼ 0.20%VIX27.56▲ 12.21%
 
Europe edition
Notitia
← Back
EconomyBFM Business

“Today, it is energy costs, and no longer the company, which determine when and how much to produce”: several Italian steelworks choose to shut down

In Italy, the price of electricity increased in October by 35.8% year-on-year on average. Consequence: the Italian steel industry, "while being one of the most carbon-free in Europe, is among the most penalized by the…

BB
BFM Business
Newswire · 29 min ago
◌ Single source2 min read
✦ Explain it to me
“Today, it is energy costs, and no longer the company, which determine when and how much to produce”: several Italian steelworks choose to shut down

Two Italian steel mills with electric furnaces will be shut down due to "high energy costs", their owner, the Pittini group, announced on Thursday. Activity will be suspended at the Verona steelworks (north-east) during the first week of December, while in Potenza (south), days of technical unemployment are planned depending on electricity prices. “High energy costs have led to a contraction in demand for the company's products, with significant repercussions on production volumes,” said the Pittini group, which produces steel for construction and industry, in a press release.

Another site near Udine (north-east) could also experience shutdowns if the situation persists. “Economically unsustainable” activities “The increase in energy costs makes productive activities economically unsustainable,” described the general director of the group’s parent company, Marco Minini, in the press release. “It therefore becomes necessary to intervene in production planning, with the aim of safeguarding the competitiveness of the site.”

Other Italian steelworks have also scheduled shutdowns in recent days depending on electricity prices, such as the Venetian Steelworks in Padua and Borgo Valsugana (northeast) or a site of the Beltrame group in Vicenza (northeast). “Today, it is energy costs, and no longer the company, which determine when and how much to produce,” described the group’s vice-president, Barbara Beltrame Giacomello, on the Beltrame site. The union of Italian steelmakers, Federacciai, sounded the alarm on November 10, stressing that "at current price levels, continuing production activity over long periods proved to be economically unsustainable, leading to a serious competitive disadvantage compared to European rivals."

Production down 4.6% The price of electricity increased in October by 35.8% over one year on average, according to the National Institute of Statistics. Steel production at the same time fell by 4.6%, to 1.9 million tonnes, according to Federacciai. “It is a particularly paradoxical situation for the Italian steel industry which, while being one of the most low-carbon in Europe, is among the most penalized by the high costs of electrical energy,” Federacciai underlined, while Italy's largest steelworks in Taranto (south) was forced by the courts to shut down its furnaces because it was polluting too much.

Source · BFM Business ↗

Machine-translated from French

Not cross-checked yet

Only BFM Business reports this story so far. We show it as a single source until another newsroom confirms it.

The reports
  1. BFM Business
    19 Nov, 19:50
Trust score: 81/100
Publisher BFM Business (established tier)+76
Checkable figures cited+3
Detailed summary+2
Total81

Method: reports are grouped by the words of their headline and summary; each newsroom counts once; figures are read from the reports as published. Nothing here is written by an AI.